|
![]() |
Display Rental Rate as
Space | Size | Term | Rental Rate | Space Use | Condition | Available |
1st Floor, Ste Cafe | 2,010 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request | Retail | - | Now |
Size |
2,010 SF |
Term |
Negotiable |
Rental Rate |
Upon Request Upon Request Upon Request Upon Request Upon Request Upon Request |
Space Use |
Retail |
Condition |
- |
Available |
Now |
Size | 2,010 SF |
Term | Negotiable |
Rental Rate | Upon Request |
Space Use | Retail |
Condition | - |
Available | Now |
LEED Certification Developed by the U.S. Green Building Council (USGBC), the Leadership in Energy and Environmental Design (LEED) is a green building certification program focused on the design, construction, operation, and maintenance of green buildings, homes, and neighborhoods, which aims to help building owners and operators be environmentally responsible and use resources efficiently. LEED certification is a globally recognized symbol of sustainability achievement and leadership. To achieve LEED certification, a project earns points by adhering to prerequisites and credits that address carbon, energy, water, waste, transportation, materials, health and indoor environmental quality. Projects go through a verification and review process and are awarded points that correspond to a level of LEED certification: Platinum (80+ points) Gold (60-79 points) Silver (50-59 points) Certified (40-49 points)
+ Ground-level F&B space in the heart of downtown’s business core + Project includes six floors of Class A commercial office & a 20-story office tower within 364,160 SF + Dedicated valet parking for visitors + Open-air courtyard connects the offices inside with the casual lounge seating, outdoor group co-working spaces, communal firepits, and lush greenscape + Frontage on 4th Avenue (10,400 ADT) between A Street (18,000 ADT) and B Street (7,900 ADT) + Area tenants include San Diego Civic Theatre, Copley Symphony Hall, The US Grant, The Westgate, Donut Bar, The Local, House of Blues, and the future Campus at Horton + Easy access to the I-5 as well as the CA-163 and CA-94 + Estimated completion date is March 2021
COLLECTION STREET | CROSS STREET | TRAFFIC VOLUME | YEAR | Distance |
---|---|---|---|---|
B St | 4th Ave, W | 8,045 | 2025 | 0.03 mi |
5th Ave | B St, S | 11,684 | 2025 | 0.03 mi |
4th Ave | A St, N | 9,728 | 2025 | 0.04 mi |
B St | 5th Ave, W | 10,840 | 2024 | 0.05 mi |
A St | 4th Ave, W | 12,866 | 2025 | 0.05 mi |
4th Ave | B St, N | 7,912 | 2025 | 0.05 mi |
A Street | 11th Ave, E | 14,906 | 2025 | 0.05 mi |
B St | 4th Ave, E | 8,294 | 2025 | 0.06 mi |
5th Ave | B St, N | 10,769 | 2022 | 0.06 mi |
3rd Ave | A St, N | 5,839 | 2025 | 0.08 mi |